Government Grant for Electric Car Home Charge Point

This is a summary of the UK Government’s scheme for subsidising home charge points for electric cars, known as the Electric Vehicle Homecharge Scheme (EVHS).

It has been kept relatively simple; if you need detailed guidance you should consult the original document (linked at the bottom).

1. Most plug-in vehicle owners carry out most charging at home.

2. Customers who are the registered keeper or have primary use of an eligible electric vehicle may receive up to 75% (capped at £500, inc VAT) off the total capital costs of the chargepoint and associated installation costs.

3. The key features of the Electric Vehicle Homecharge Scheme are as follows:

  • The grant is a 75% contribution towards the cost of one chargepoint and its
    installation up to a maximum of £500 (including VAT) per household/eligible
    vehicle.
  • Customers must provide evidence of being the primary user of an eligible electric vehicle or have a vehicle on order in order to be able to qualify for the grant.
  • The date of installation must not be more than 4 months ahead of the date
    of delivery or start date of vehicle use.

4. The grant covers up to 75% of the eligible costs of chargepoint installation, the
customer form requires confirmation of who is paying the balance of the
installation costs.

5. The grant for 75% must be claimed against an approved chargepoint and
made on your behalf by a chargepoint installer which has been authorised
by the Office for Low Emission Vehicles (OLEV).

6. You must have off street parking facilities suitable for chargepoint installation (a survey prior to installation should be conducted by your installer). If you do not have off street parking, your Local Authority may be able to help via a central Government grant.

7. The authorised chargepoint installer will claim the 75% (capped at £500) on your behalf. How the remaining cost is to be met should be agreed with your installer prior to installation. In any event, you should satisfy yourself whether you are expected to pay the remaining cost, and if not who will be paying for it, before the installation takes place. The grant will only be paid in arrears (i.e. once installation is complete).

8. No more than 2 chargepoints can be funded at one property irrespective of how many vehicles are registered there.

Source: EVHS – Guidance for Customers: November 2016

Comments (2)

  1. Pingback: Installing a Charge Point for your Electric Car | Fuel Included

  2. Pingback: Electric Car Incentives 1: Government - Grants, Road Tax and Company Car Tax - Fuel Included: Electric cars with FREE fuel

Leave a Reply

%d bloggers like this: